Fictional example · F01
Film Screening Subtitle Assignment Sheet
Approval AP-01 · Delivery manifest DL-01 · Both screenings use CUT-03.
Initial: 1/3 required assignments match. Corrected: 3/3. S2 AUX is the one not-applicable row.
| Screening | Room | Screen | Required language | Required cut | Initial file | Final file | Initial list check | Final list check | Projection observation |
|---|---|---|---|---|---|---|---|---|---|
| S1 | North Room | MAIN | es | CUT-03 | ES-03 | ES-03 | Match | Match | |
| S1 | North Room | AUX | fr | CUT-03 | FR-02 | FR-03 | Wrong cut | Match | |
| S2 | South Room | MAIN | en | CUT-03 | ES-03 | EN-03 | Wrong language | Match | |
| S2 | South Room | AUX | Not applicable | Not applicable |
S1 MAIN stays ES-03. S1 AUX changes from FR-02 to FR-03 because the cut changed. S2 MAIN changes from ES-03 to EN-03 because the language is different. The playback operator fills in the projection observations after the venue test.
| File ID | File revision | Language | Cut | Output |
|---|---|---|---|---|
| ES-03 | v1 | es | CUT-03 | MAIN |
| FR-02 | v1 | fr | CUT-02 | AUX |
| FR-03 | v1 | fr | CUT-03 | AUX |
| EN-03 | v1 | en | CUT-03 | MAIN |
Handoff to projection operator. Load the corrected assignments from DL-01. Verify each required output with CUT-03 in its own room. Record date, observation and retest on a copy of the blank worksheet.