Fictional example · F01

Film Screening Subtitle Assignment Sheet

Approval AP-01 · Delivery manifest DL-01 · Both screenings use CUT-03.

Initial: 1/3 required assignments match. Corrected: 3/3. S2 AUX is the one not-applicable row.

Approval and handoff
ScreeningRoomScreenRequired languageRequired cutInitial fileFinal fileInitial list checkFinal list checkProjection observation
S1North RoomMAINesCUT-03ES-03ES-03MatchMatch
S1North RoomAUXfrCUT-03FR-02FR-03Wrong cutMatch
S2South RoomMAINenCUT-03ES-03EN-03Wrong languageMatch
S2South RoomAUXNot applicableNot applicable

S1 MAIN stays ES-03. S1 AUX changes from FR-02 to FR-03 because the cut changed. S2 MAIN changes from ES-03 to EN-03 because the language is different. The playback operator fills in the projection observations after the venue test.

Delivered files
File IDFile revisionLanguageCutOutput
ES-03v1esCUT-03MAIN
FR-02v1frCUT-02AUX
FR-03v1frCUT-03AUX
EN-03v1enCUT-03MAIN

Handoff to projection operator. Load the corrected assignments from DL-01. Verify each required output with CUT-03 in its own room. Record date, observation and retest on a copy of the blank worksheet.