Fictional example · manual planning file
Small Plant PM Schedule
Enter each task’s approved interval, last completed record, and current meter. Choose Recalculate or leave the edited field to refresh the results.
Planning only. This file does not read sensors, create work orders, synchronize users, approve safe use, or supply maintenance intervals. Replace every fictional task and interval with values from the manufacturer and your facility owner.
Valid tasks0
Overdue0
Due soon0
Scheduled0
Overdue: an active limit is pastDue soon: no limit past, within a warning windowScheduled: outside every active warning window
How the status is chosen
The file checks the status date against the next due date and the current meter against the next hour limit. If either has passed, the task is Overdue. Otherwise, matching either warning window makes it Due soon. The remaining tasks are Scheduled. A row with both limits shows both results.
Before relying on the result
Confirm the task, interval, completion record, meter unit, current reading, warning window, and local approval process. A calculated reminder is not proof that work was done or that equipment is safe to operate.