Stage management · rehearsal report 4

Glass Harbor

Fictional one-act production · completed rehearsal record

Fictional example
Rehearsal dateNovember 21, 2026
LocationStudio B
Call / break / end6:00 PM / 7:18-7:28 PM / 9:02 PM
Next callNov 23 · 6:00 PM · Studio B

What happened in the room

TimeActual workCalled roles
6:00-6:22Company warm-up and spacing checkFull cast
6:22-7:18Pages 8-17: dock arrival through lantern handoffLead, traveler, dockworker
7:18-7:28BreakAll present
7:28-8:24Pages 18-26: storm sequence, twiceFull cast
8:24-9:02Pages 27-31 and notesLead, traveler
Observed fact: the lantern was transferred during the page 16 cross on both runs. Interpretation to review: the handoff may need more light; lighting decides after watching it.

Attendance

Present: all called performer roles and rehearsal stage management. Late: none. Absent: none. No personal health information is recorded.

Next rehearsal

Call: November 23, 2026 at 6:00 PM in Studio B. Planned work: pages 8-31, then the storm-to-dock transition. Called: full cast and rehearsal stage management.

Department notes

Scenic Confirmed

Fact: the cast used a taped 18-inch square for the dock crate.

Update The 18-inch rehearsal cube is confirmed for Studio B. Owner: scenic lead. Due: Nov 23, 5:30 PM.

Props Decision

Fact: the paper lantern bent during the second handoff.

Decision Continue with the foam rehearsal lantern. Owner: props lead. Due: Nov 23 call.

Costume Open

Fact: the traveler kneels twice on pages 22-23.

Request Confirm whether rehearsal knee protection changes the coat line. Owner: costume lead. Due: Nov 24 noon.

Lighting Open

Fact: the lantern handoff moved from stage right to center.

Request Watch the page 16 handoff before setting a look. Owner: lighting lead. Due: Nov 25 design check.

Sound Confirmed

Fact: the storm sequence ran twice with the rehearsal track.

Decision Keep the thunder cue after the door close. Owner: sound lead. Due: Nov 23 call.

Requests and decisions at a glance

TypeItemOwner roleDeadline
Confirmed18-inch rehearsal cube for Studio BScenic leadNov 23, 5:30 PM
DecisionUse foam rehearsal lanternProps leadNov 23 call
RequestReview knee protection and coat lineCostume leadNov 24 noon
RequestWatch page 16 handoffLighting leadNov 25 design check
DecisionThunder follows door closeSound leadNov 23 call