Stage management · rehearsal report 4
Glass Harbor
Fictional one-act production · completed rehearsal record
What happened in the room
| Time | Actual work | Called roles |
|---|---|---|
| 6:00-6:22 | Company warm-up and spacing check | Full cast |
| 6:22-7:18 | Pages 8-17: dock arrival through lantern handoff | Lead, traveler, dockworker |
| 7:18-7:28 | Break | All present |
| 7:28-8:24 | Pages 18-26: storm sequence, twice | Full cast |
| 8:24-9:02 | Pages 27-31 and notes | Lead, traveler |
Attendance
Present: all called performer roles and rehearsal stage management. Late: none. Absent: none. No personal health information is recorded.
Next rehearsal
Call: November 23, 2026 at 6:00 PM in Studio B. Planned work: pages 8-31, then the storm-to-dock transition. Called: full cast and rehearsal stage management.
Department notes
Scenic Confirmed
Fact: the cast used a taped 18-inch square for the dock crate.
Update The 18-inch rehearsal cube is confirmed for Studio B. Owner: scenic lead. Due: Nov 23, 5:30 PM.
Props Decision
Fact: the paper lantern bent during the second handoff.
Decision Continue with the foam rehearsal lantern. Owner: props lead. Due: Nov 23 call.
Costume Open
Fact: the traveler kneels twice on pages 22-23.
Request Confirm whether rehearsal knee protection changes the coat line. Owner: costume lead. Due: Nov 24 noon.
Lighting Open
Fact: the lantern handoff moved from stage right to center.
Request Watch the page 16 handoff before setting a look. Owner: lighting lead. Due: Nov 25 design check.
Sound Confirmed
Fact: the storm sequence ran twice with the rehearsal track.
Decision Keep the thunder cue after the door close. Owner: sound lead. Due: Nov 23 call.
Requests and decisions at a glance
| Type | Item | Owner role | Deadline |
|---|---|---|---|
| Confirmed | 18-inch rehearsal cube for Studio B | Scenic lead | Nov 23, 5:30 PM |
| Decision | Use foam rehearsal lantern | Props lead | Nov 23 call |
| Request | Review knee protection and coat line | Costume lead | Nov 24 noon |
| Request | Watch page 16 handoff | Lighting lead | Nov 25 design check |
| Decision | Thunder follows door close | Sound lead | Nov 23 call |