ORIGINAL FICTIONAL EXERCISE

Two batches, two denominators

Both batches have two first-attempt completions. Their completion rates differ because their sample sizes differ.

Reading companion to the actual Sweetviz 2.3.2 export
MeasureBatch ABatch B
Source checks43
First-attempt completions22
Completion rate2/4 = 50%2/3 ≈ 66.7%
Total inspection minutes2030
Mean inspection minutes20/4 = 530/3 = 10

These seven records are invented. The comparison describes the supplied samples. It does not demonstrate a process improvement or explain why the batches differ.

Inspect all seven source records
Minutes and first-attempt completion, in source order
BatchMinutesFirst attempt
A2true
A4false
A6true
A8false
B3true
B9false
B18true

Keep the native report with this reading copy

This page is an authored companion, not Sweetviz's own layout. The native export contains the actual feature charts and expandable details. Its small-screen text and expanded desktop width need separate consideration.

Download the untouched Sweetviz report · Download the complete generator

Static report. No uploading, saving, or Python recalculation occurs here.